Industry news|2022-06-06| admin
The installation of the planetary gearbox is a relatively simple process, but some details need to be paid attention to during the installation process. The installation process of the planetary gearbox is roughly divided into three steps: inspection size, installation, and testing. The main thing is to confirm the planetary gear. The coaxiality of the gearbox during installation will have a great impact, so let's learn about the installation process of the planetary gearbox and some precautions!
Before installing the planetary gearbox and the motor, it is necessary to confirm whether they are in good condition, and it is necessary to check whether the dimensions of the connected parts match, mainly referring to whether the installation size between the motor and the gearbox is correct.
Send the screws of the dust-proof holes on the outer side of the planetary gearbox, adjust the position to align the side holes and the dust-proof holes, remove the motor shaft key, and carry out anti-rust treatment on the installation parts of the motor and the gearbox to ensure the tightness of the connection and the later operation. of fluency.
When connecting, it is necessary to ensure that the coaxiality between the two is consistent. If it is inconsistent, it will affect the later operation, wear the internal gear of the gearbox or break the shaft. During the installation process, it is forbidden to hit the gearbox with a hammer to prevent damage caused by excessive axial force or radial force.
When the gearbox and the motor are connected, first install the diagonal screws to ensure uniform force, then install the other two diagonal bolts, tighten the four mounting bolts one by one, and finally tighten the captive screws on both sides, some high-precision installation requires the use of a torque wrench.
After the gearbox is installed, it needs to be fixed on the bracket, and the stability of the installation needs to be ensured. If the gearbox is unstable during high-speed operation, it may cause vibration and external noise, which will indirectly affect the coaxiality of the installation. When gears or other components are externally installed during transmission, protective devices need to be installed. After the installation is completed, check the stability and flexibility of the installation parts in turn, and the idling test can be carried out. The operation process should be relatively stable, without obvious vibration and noise. When there are some abnormal phenomena, the problem should be eliminated.
The planetary gearbox needs to be carefully installed during the installation process. Good installation can achieve twice the result with half the effort. Installation according to standard procedures can save a lot of maintenance costs in the later period. If the coaxiality is inconsistent during installation, it will have a great impact on the later use and the gearbox itself. Therefore, during the installation of the gearbox, attention must be paid to the coaxiality of the gearbox and some details.
| 成人做爰黄 片免费观看 | 国模私拍一区二区三区 | 免费看人与拘做受A片 | 人人妻人人妻人人片色av | 国产精品老熟女一区二区 | 欧美日日澡夜夜澡A片免费户村病 | 亚洲天堂男人天堂 | 影音先锋在线中文字幕 | 人人玩人人添人人澡丶 | 轻轻啪毛茸茸在线视频免费观看 | 国产寡妇婬乱A毛片91精品 - 百度 | 国产一区二区无码在线观看 | 久久久又黄又爽免费观看下载 | 人妻精品一区二区蜜桃在线看 | 亚洲精品一区中文字幕乱码 | 懂色av粉嫩av色老板 | 老女人一区二区三区老牛免费视频 | 少妇高潮毛片免费播放A片 十分钟做a小视频免费观看 | 国产又粗又硬又长又爽 | 人妻被黑人猛烈进入A片 | 国产性艳史一区二区在线观看 | 日本一级特黄大真人片 | 欧美激情无码视频一二三 | 国产女教师一级爽A片色情91 | 国产传媒免费在线观看 | 97人妻人人揉人人躁人人爽动漫 | 欧美成人精品一区二区三区 | 人人妻人人澡人人爽人人 | 俺来也俺也啪WWW色 富婆鸭子一区二区三区 | 国产精品一级无码毛片视频 | 亚洲素人无码不卡中文字幕 | 午夜精品一区二区三区在线视频 | 大JI巴好深好爽又大又粗视频 | 亚洲精品无码成人A片在线沈先生 | 丰满岳乱妇一区二区三区视频 | 在线免费电影中文字幕av | 免费高清无码视频在线观看 | 国产精品系列magent | 欧美一级孕交成人片 | 中文字幕免费观看哔哔在线 |